High-quality carbon removal from a 50,000-tonne DOC plant in China.

A 50,000 t/yr plant under development in Hainan. MRV designed to Isometric DOCS; first delivery subject to permitting and registration.

50,000t / yr
Gross capture, phase 1
43,000t / yr
Net removal, estimated
450–550USD/t
Cost-based, per net tonne
DOCSmethodology
Isometric, published 2025

Above: Captura's Kona pilot, in operation since February 2025. Image: Captura.

Air is 0.04% CO₂. Seawater is roughly 150 times more concentrated.

01
No sorbents, no additives

The process runs on seawater and renewable power, with no by-products.

02
The ocean does the rest

Returned seawater re-absorbs CO₂. Third-party measurements at Captura's pilot ranged from 65% to 98%.

03
Built on existing infrastructure

DOC shares intake and outfall with power plants, desalination plants and ports.

From site to delivery.

Site

Lingao, Jinpaigang

A ~94-mu plot recommended in March 2026; admission accepted.

Status · Letter issued
Power

CHN Energy (Hainan)

Non-binding MOU signed in April 2026.

Status · MOU signed
Storage

CNPC Southern Oilfield

Cooperation meeting held; minutes issued; MOU in progress.

Status · In discussion
Technology

Captura

2024 MOU and services agreement cover FEL-1.

Status · Signed

Developed at Caltech. Scaled in Hawaiʻi.

All figures reported by Captura. Carbonjour is Captura's designated partner in China.

Captura's Kona pilot plant beside the ocean in Hawaiʻi
Captura's 1,000 t/yr Kona pilot, in operation since February 2025. Image: Captura.
1,000 t/yrKona pilot capacity, operating since February 2025
20 / 20Indicators passed in Equinor's technical qualification, November 2025
DOCSIsometric methodology certified, October 2025
2022XPRIZE Carbon Removal milestone award

How early engagement works.

No commitment at this stage; an NDA is only needed for documents.

01

Register interest

Tell us your target volume and delivery window.

02

Intro call

Scope, timing and what you need from MRV.

03

NDA and diligence

Documents, then technical and MRV review.

04

Indicative terms

Volume, delivery window and price basis.