The 1,800 vs
3,200 kWh/t
question.

TopicEnergy and boundaries
Published18 October 2026
Reading time6 minutes

Two numbers for the same tonne of carbon. Both are right, and the gap is the boundary.

Captura's white paper cites about 1,800 kWh per tonne of CO₂ for its DOC system. Our own project estimates use 3,000–3,200 kWh per tonne. Readers sometimes treat this as a contradiction. It is not: the two figures measure different things, and understanding the difference is the first step to comparing capture technologies honestly.

What the 1,800 figure covers

The white paper figure is a system energy number: the electricity the DOC process itself needs to move seawater through the electrochemical stack, swing the pH, and release the CO₂. It is the right number for asking whether the core technology is efficient. It is not the number for asking what a plant will draw from the grid.

What the full-plant figure adds

A complete plant has to do more than the core process. The gap between system energy and full-plant energy comes from steps that are easy to forget when comparing cells and stacks:

  • Intake and outfall. Pumping seawater through a real intake, screen and outfall costs energy, and the head loss depends on the site.
  • Pretreatment and softening. The diverted stream needs conditioning before it reaches the membranes.
  • Degassing and vacuum. Extracting CO₂ from water requires vacuum and gas handling.
  • Compression. CO₂ must be raised to pipeline or injection pressure, which is a significant load per tonne.
  • Liquefaction, if used. Shipping CO₂ as a liquid adds a further energy penalty.
  • Auxiliaries and part-load. Controls, cooling, buildings and operation away from the design point all add consumption.

Each line is small next to the electrochemical stack; together they are not. That is how a system figure of about 1,800 kWh/t becomes a full-plant figure of about 3,000–3,200 kWh/t.

Gross versus net makes it worse

There is a second denominator problem. A 50,000 t/yr plant captures about 50,000 tonnes gross, but net removal is lower — about 43,000 tonnes in our phase 1 estimate — because life-cycle emissions from construction, power supply and transport are deducted. Energy per gross tonne and energy per net tonne therefore differ by roughly 15%. Publishing one without saying which is a common source of confusion.

How to compare technologies

If the question is “which technology is more energy-efficient”, compare on a consistent, full-plant boundary, per net tonne, including compression and storage. Captura's white paper compares its projections with other nascent CDR technologies; that comparison is a projection, not a measured head-to-head. Published DAC energy figures vary widely with design, sorbent and boundary, so a single number from one paper should not be set against a single number from another.

A better comparison also includes power price, load factor and the emissions intensity of the electricity. A plant using 3,200 kWh/t on a low-carbon grid can have a lower net footprint than a plant using 1,800 kWh/t on a coal-heavy one.

Why we publish ranges

Because a single number invites the wrong comparison. Our Economics page gives CAPEX, power price, electricity use and full cost as ranges, with the assumptions stated, and a calculator that lets a reader test their own inputs. The full model, with the line-by-line energy breakdown, is available under NDA.

Three questions to ask any DOC developer

  1. Does the energy figure include intake, compression and storage, or only the capture system?
  2. Is it per gross tonne or per net tonne removed?
  3. What load factor and grid emissions intensity were assumed?

If the answers are not on the page, the number is not comparable — however precise it looks.

Sources

  • Captura, technology white paper (2024): ~1,800 kWh/t system energy.
  • Carbonjour phase 1 project estimate (internal): 3,000–3,200 kWh/t full plant, gross and net removal assumptions.
  • Carbonjour, Economics page, for the published ranges and assumptions.